andrii / notebook

Umicore Battery Materials Poland

Nysa, Poland · MJ Group · November 2025–14 June 2026

Client site: Umicore Battery Materials Poland, Nysa. B2B project delivered through MJ Group.

  • Configured field sensors and instrumentation, prepared equipment for production-line startup and participated in commissioning.
  • Prepared acceptance protocols and compiled as-built documentation, equipment certificates and records in accordance with equipment Data Sheets.
  • Read electrical drawings and P&IDs, investigated installation and connection issues, and coordinated corrective work with the project team.
  • Coordinated commissioning activities involving field instrumentation, control valves and pneumatic equipment.
  • Developed a script to generate protocols from the I/O List and introduced structured issue tracking to streamline documentation and defect resolution.

Tools included HART, DeviceCare, SOPAS ET and PRONETA. Assignment ended on 14 June 2026.

See my experience and FactoryMap and line relocation.

A small corner of the internet.
Search across all notes↑↓ navigate ↵ open