Umicore Battery Materials Poland
Nysa, Poland · MJ Group · November 2025–14 June 2026
Client site: Umicore Battery Materials Poland, Nysa. B2B project delivered through MJ Group.
- Configured field sensors and instrumentation, prepared equipment for production-line startup and participated in commissioning.
- Prepared acceptance protocols and compiled as-built documentation, equipment certificates and records in accordance with equipment Data Sheets.
- Read electrical drawings and P&IDs, investigated installation and connection issues, and coordinated corrective work with the project team.
- Coordinated commissioning activities involving field instrumentation, control valves and pneumatic equipment.
- Developed a script to generate protocols from the I/O List and introduced structured issue tracking to streamline documentation and defect resolution.
Tools included HART, DeviceCare, SOPAS ET and PRONETA. Assignment ended on 14 June 2026.